Maharashtra's Draft Rooftop Solar Rules: Battery Storage Above 100 kW and What It Means for Your Factory

Maharashtra's Draft Rooftop Solar Rules: Battery Storage Above 100 kW and What It Means for Your Factory

Published Updated
Rooftop SolarPolicy

Maharashtra wants to change how rooftop solar works for its factories. Under a draft from the state regulator, any new rooftop plant above 100 kW would need a battery, and banking surplus solar with the grid would start to cost money.

The rules are still a draft. But Maharashtra is one of India's biggest rooftop solar markets, and the direction is clear. If you run a factory, warehouse, hospital or hotel in the state and are planning solar, this is the time to plan around it, not after it.

What has Maharashtra proposed for rooftop solar?

MERC (Maharashtra Electricity Regulatory Commission) has published the draft Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2026. They would replace the current rooftop rules and add three big changes: a storage mandate above 100 kW, paid banking with time slots, and a cap on how much rooftop solar a local transformer can host.

The draft was released in September 2026 as part of a set of seven draft regulations reported by SolarQuarter, covering connectivity, open access, rooftop solar, battery storage, forecasting, renewable purchase obligations and the state grid code. Pune Pulse reported that objections were accepted until 12 October 2026. The final rules have not been notified yet.

Maharashtra matters for every C&I (commercial and industrial) buyer watching policy. It took 15% of India's rooftop solar additions in Q2 2026, second only to Uttar Pradesh, according to Mercom India's rooftop market report.

Will my factory's rooftop solar plant need a battery?

Yes, if the plant is new and above 100 kW. The draft makes energy storage mandatory for new grid-interactive and behind-the-meter rooftop systems above 100 kW, as Mercom India reported.

You get two ways to comply, according to SolarQuarter's summary of the draft:

  • A battery equal to 50% of the solar capacity, with two hours of duration, or
  • A battery equal to 25% of the solar capacity, with four hours of duration.

There is also a floor: at least 1 kWh of storage per kW of solar until 2030, rising to 2 kWh per kW after that.

Here is what that looks like for a few typical factory plant sizes:

Solar plant sizeOption A: 50% for 2 hoursOption B: 25% for 4 hoursMinimum energy until 2030Minimum energy after 2030
200 kW100 kW battery, 200 kWh50 kW battery, 200 kWh200 kWh400 kWh
500 kW250 kW battery, 500 kWh125 kW battery, 500 kWh500 kWh1,000 kWh
1,000 kW500 kW battery, 1,000 kWh250 kW battery, 1,000 kWh1,000 kWh2,000 kWh

Plants of 100 kW and below would not need storage. Pune Pulse notes that how the rule applies near the 100 kW line still needs clarity, so check the final text before you size a plant at, say, 99 kW or 101 kW.

What happens to existing rooftop solar plants?

Existing plants are protected. Systems already set up under the current rules would continue under their existing arrangements until the agreement ends, the capacity is increased, or the owner chooses to move to the new rules, according to SolarQuarter.

The catch is expansion. If you add capacity to an existing plant, or change its design or metering method, the new rules would apply. A factory planning a phase two should factor that in now.

How will solar banking change in Maharashtra?

Banking would no longer be free for most C&I plants. Today, surplus solar you export can be adjusted against later consumption. The draft replaces that with monetary charges and time slots.

According to SolarQuarter, the draft proposes:

  • Up to 3 kW: annual banking, no time slots, no banking charges.
  • 3 to 10 kW: monthly settlement, no banking charges.
  • Above 10 kW: monthly settlement across time slots, with a fixed "banking and standby charge" (in rupees per kW per month) and a variable banking charge (in rupees per kWh on energy set off).
  • Above 5 MW: banking capped at 10% of consumption per slot, and withdrawn after three years.

The number of slots rises with size: four for 10 to 100 kW, eight for 0.1 to 1 MW, twelve for 1 to 5 MW and 24 above 5 MW. In plain words, the bigger the plant, the closer your solar must match your consumption hour by hour to avoid charges.

Two details matter for your savings. First, Pune Pulse reports that for systems above 3 kW, unused banked energy may not carry forward past the month. Second, the actual charge rates are not fixed in the draft; they are to be set later by MERC. So nobody can yet put an exact rupee figure on the new banking cost.

What is the 70% transformer cap?

It limits how much rooftop solar can connect to one part of the local grid. Under the draft, total rooftop capacity on a single distribution transformer or feeder would generally be restricted to 70% of its rated capacity, SolarQuarter reports. The discom (distribution company) can allow more after a detailed load study.

For a factory, this is an approval risk rather than a cost. If many neighbours in your industrial area have already gone solar, your application could need a load study before it is approved. Apply early, and ask your developer to check transformer headroom as part of the feasibility study.

How much solar can a factory install under the draft?

Up to your contract demand or sanctioned load, if you export to the grid. Behind-the-meter systems that never inject power into the grid would have no contract demand limit, according to SolarQuarter.

The draft keeps a wide menu of metering options: net metering, net billing, group net metering, gross metering and virtual net metering, and lets consumers switch arrangement twice during the agreement. Connection agreements would run for 20 years.

There is one warning for behind-the-meter plants. Per SolarQuarter, a behind-the-meter installation above 1 kW set up without informing the discom would attract fixed charges at twice the default rate. Always declare your plant.

For a step-by-step method to find your right plant size, see our guide on how to size rooftop solar for a factory.

Does a battery still make sense for a factory?

For many factories, it can. A battery lets you shift solar from midday into evening hours, when grid power often costs more under time-of-day tariffs, and it reduces how much you depend on banking. If banking turns into a paid service, storing your own surplus becomes more attractive.

The trade-off is upfront cost. A plant with storage costs more than a solar-only plant, and the payback depends on your tariff, your load shape and the final banking charges. This is where the ownership model matters. Under a zero investment rooftop solar model, the developer funds the solar plant, and in some cases the storage too, and you pay only for the power you use.

If you prefer to own the asset and claim the tax benefits, CAPEX rooftop solar lets you buy the plant outright. Either way, plan the battery energy storage design alongside the solar design, not as an afterthought.

Is Maharashtra the only state tightening rooftop rules?

No. Several states are rewriting their rooftop solar rules in 2026, and the pattern is similar: tighter limits on what can be pushed into the grid, and more value placed on using solar where and when it is produced. We covered the same shift in Gujarat's new rooftop solar rules and in Bihar's draft 500 kWp net metering cap.

The lesson across states is the same. Size solar to your own daytime load, keep exports low, and treat storage as part of the plan.

What should a Maharashtra factory do now?

Act on what is certain, and stay flexible on what is not. A short checklist:

  1. Know your load curve. Get 12 months of bills and, if possible, 15-minute interval data. Slot-based banking rewards plants that match consumption.
  2. Do not count on beating the deadline. Existing plants keep their terms, but how the final rules will treat applications filed during the draft stage is not yet clear. Ask your discom and developer before you assume old terms apply.
  3. Size around 100 kW with care. If your load is close to the threshold, compare a 100 kW solar-only plant with a larger plant plus storage.
  4. Check transformer headroom early. The 70% cap could slow approvals in dense industrial clusters.
  5. Price the battery both ways. Compare owning the system with an OPEX (operating expenditure) model where the developer carries the investment.
  6. Watch for the final notification. Charge rates, the exact 100 kW wording and the settlement rules could still change.

FAQ

Are Maharashtra's new rooftop solar rules final?

No. They are a draft issued by MERC in September 2026. Objections closed on 12 October 2026, and the final regulations have not yet been notified.

Does the battery rule apply to my existing solar plant?

Not unless you change it. Existing plants continue under their current terms until the agreement ends, the capacity is increased, or the owner opts into the new rules.

How big must the battery be for a 500 kW rooftop plant?

Under the draft, either 250 kW for two hours or 125 kW for four hours, which is 500 kWh in both cases. After 2030 the minimum rises to 1,000 kWh.

Will banking charges apply to small rooftop systems?

No. Systems up to 10 kW would not pay banking charges. The fixed and variable banking charges apply above 10 kW of contracted renewable capacity.

Can I avoid the storage rule with a behind-the-meter plant?

No. The draft applies the storage mandate to new behind-the-meter systems above 100 kW as well as grid-interactive ones.

About SustVest

SustVest (SolarGridX Ventures Pvt Ltd) is a rooftop solar developer in India, ranked #5 among India's top rooftop solar developers by CRISIL in 2026. We run 80+ distributed solar plants (about 30 MW) across 13 states for factories, hospitals, hotels, tea estates and institutions, mostly under the OPEX/RESCO model where we fund, build, own and maintain the plant at zero upfront cost to you. Planning solar in Maharashtra? Talk to our team about a plant designed for the new rules.