Supreme Court Blocks Retrospective 70:30 GST on Solar EPC: What It Means for Buyers

Supreme Court Blocks Retrospective 70:30 GST on Solar EPC: What It Means for Buyers

Published
Solar FinancePolicy

On 16 November 2026, the Supreme Court of India settled a long-running GST (Goods and Services Tax) fight over solar plants. It ruled that the 70:30 formula, which taxes part of a solar EPC (Engineering, Procurement and Construction) contract as a service at a higher rate, cannot be forced on supplies made before 1 January 2019.

The case was about one large EPC company and a demand of over ₹53 crore. But the reasoning reaches further. It tells every factory owner, CFO and plant head how the courts now look at a solar plant for tax purposes, and why the GST clause in your solar contract deserves a careful read.

What did the Supreme Court decide about GST on solar EPC contracts?

The Court held that the 70:30 valuation rule for solar power generating systems is prospective, so it applies only from 1 January 2019 onwards. Tax officers could not use it to reopen solar supplies made between 1 July 2017 and 31 December 2018.

The judgment, M/s Sterling and Wilson Pvt. Ltd. v. Union of India (2026 INSC 1222), was delivered by Justice Sanjay Kumar and Justice Sanjeev Sachdeva, as Verdictum reported. The Court allowed the appeal and set aside both tax orders against the company.

Three findings matter most for buyers:

  • No retrospective 70:30 split. The Court said the method "was prospective" and had no retrospective effect on supplies made before 1 January 2019.
  • A solar plant is not automatically immovable property. Fixing a solar system to a civil foundation for stability does not, by itself, turn it into immovable property.
  • Not every composite supply is a works contract. A works contract under GST needs an end product that is immovable property.

What is the 70:30 GST rule for solar plants?

The 70:30 rule treats 70% of a solar EPC contract's value as goods and 30% as services, with each part taxed at its own rate. It was brought in by Notification No. 24/2018-Central Tax (Rate), dated 31 December 2018, with effect from 1 January 2019.

Before that date, many EPC companies charged one goods rate on the full contract, because solar power generating systems were listed at Serial No. 234 of the goods rate schedule. The judgment gives a simple example. On a ₹10,000 contract, 5% on the whole value is ₹500. Under 70:30, 5% on ₹7,000 is ₹350 and 18% on ₹3,000 is ₹540, a total of ₹890, or 8.9%.

MethodHow GST is worked out on ₹10,000TaxEffective rate
Single goods rate (used before 2019)5% on ₹10,000₹5005%
70:30 split (from 1 January 2019)5% on ₹7,000 plus 18% on ₹3,000₹8908.9%

The gap is large on a factory-sized plant. That gap is exactly what the tax department tried to collect for the earlier period.

Why did the tax department raise a ₹53 crore demand?

The department argued that supplying and installing a solar plant was a works contract, because the plant became immovable property once fixed to the ground. On that basis it applied the 70:30 split to supplies made from July 2017 to December 2018.

The company had paid 5% (2.5% CGST plus 2.5% SGST) on the entire contract value. The Joint Commissioner of CGST, Thane, confirmed a central tax demand of ₹13,33,95,241 plus an equal penalty, according to the Jurishour report of the ruling. With the matching state tax and penalty, the total came to ₹53,35,80,964, or about ₹53.36 crore.

The department also leaned on a 2021 clarification, Circular No. 163/19/2021-GST dated 6 October 2021, to say the 70:30 split had to apply even to earlier years.

Why did the Court say the 2021 circular was misread?

The Court found that the 2021 circular gave taxpayers a choice for the earlier period, not a mandate. Officers had "misunderstood this clarification to imply a mandate", the judgment says.

In plain words, a company that had already paid GST one way for 2017 and 2018 could not be forced to repay it the other way. The Court also noted a built-in limit: no refunds would be given where tax had already been paid at 18% on the entire contract value. So the circular protected past positions in both directions rather than reopening them.

The Court also struck down the use of the longer five-year limitation period under Section 74 of the CGST Act. That section needs fraud, wilful misstatement or suppression of facts. Paying tax under a published rate entry is none of those.

Is a rooftop solar plant movable or immovable property under GST?

It depends on the facts, but the Supreme Court has made clear that bolting a plant to a foundation does not settle the question. The test looks at how and why the plant is attached, and whether it can be removed and used elsewhere without damage.

The judgment says that when a solar power generating system "can be easily detached from the foundation and used elsewhere", it cannot be treated as immovable. Commentators at TaxGuru list the factors the Court weighed: the nature and purpose of the attachment, the intention behind it, whether fixing only helps the plant work better, and whether it can be shifted and sold.

Rooftop plants sit on mounting structures fixed to a shed or slab, and they are often shifted when a roof is repaired. The ruling is likely to be cited in disputes over rooftop and ground-mounted plants. But TaxGuru stresses that the outcome stays fact-dependent, so each installation will be judged on how it is built.

What does the ruling mean for factories that bought solar plants before 2019?

If you bought a solar plant on a CAPEX (capital expenditure) basis between July 2017 and December 2018, the ruling lowers the risk of an old GST dispute flowing back to you. The Court has held that the 70:30 split could not be forced on that period.

Why should a buyer care about a tax fight between the government and an EPC company? Because many EPC contracts carry a "change in law" or "tax variation" clause. If the EPC company had lost, it might have tried to recover the extra GST from its customers under such a clause. Three quick checks:

  1. Find your contract's tax clause. See whether the price was "inclusive of all taxes" or whether later tax demands could be passed on.
  2. Check any open notices. If your EPC vendor has raised a claim for extra GST on a pre-2019 plant, share the judgment with your tax advisor.
  3. Check your input tax credit. If you claimed credit on the plant, confirm the invoices match the GST actually paid.

This is general information, not tax or legal advice. Your chartered accountant should review your own invoices and contract.

What does it mean for factories buying a solar plant today?

For a plant bought today, the bigger number is the lower goods rate. The GST Council, in its 56th meeting on 3 September 2025, cut GST on renewable energy devices from 12% to 5%, effective 22 September 2025, as the Ministry of New and Renewable Energy announced on PIB.

We explain how today's rates flow through a project in our guide to GST on rooftop solar for CAPEX and OPEX buyers. The lesson from this case is about clarity, not the rate itself. When you buy the solar plant outright, ask your EPC partner to show:

  • how the contract value is split between goods and services on the invoice;
  • which GST rate is applied to each part, and under which rate entry;
  • who bears the cost if a tax officer later takes a different view;
  • whether the price is fixed, or can change if tax rules change before commissioning.

A clean, documented GST position protects your input tax credit and avoids surprise claims years later.

Does the GST ruling change anything under an OPEX or RESCO model?

Under an OPEX (operational expenditure) or RESCO (Renewable Energy Service Company) model, the developer buys, owns and maintains the plant, so the developer carries the GST on construction. You pay only for the solar units the plant produces, at an agreed per-unit tariff.

That shifts the EPC tax risk away from your balance sheet. With zero investment rooftop solar, a dispute like this one sits with the plant owner, not with the factory. It is one more reason CFOs weigh both routes side by side, as we set out in our comparison of CAPEX vs OPEX rooftop solar.

You still need to read the PPA (Power Purchase Agreement) carefully. Check whether the tariff can be revised if taxes change, and who pays if they do. Our rooftop solar PPA checklist covers the change-in-law clause and the other terms that decide your real savings.

What should CFOs and plant heads do now?

Treat the ruling as a prompt to tidy up your solar paperwork. Most buyers need only a short review, and it is best done before a dispute appears.

  • Pre-2019 CAPEX plant: keep the invoices, contract and GST returns together. Share the judgment with your tax advisor if any claim is open.
  • Plant being quoted now: ask for the goods and services split, the rate entry used, and a clear tax-change clause in writing.
  • Considering OPEX: compare the per-unit tariff with your grid tariff, and check the PPA's change-in-law terms.
  • Existing plant of any type: make sure the asset register describes the plant correctly, including its mounting and foundation.

Good records also help with plant upkeep and claims. A developer that offers solar O&M and plant maintenance should keep equipment lists and service logs that match your invoices.

FAQ

Does the Supreme Court ruling cut GST on new solar plants?

No. The ruling is about supplies made between July 2017 and December 2018. Rates for new plants follow the current notifications, including the cut on renewable energy devices to 5% from 22 September 2025.

Can tax officers apply the 70:30 split to solar plants supplied before 2019?

Not as a compulsory rule. The Supreme Court held that the 70:30 valuation method, effective 1 January 2019, is prospective and cannot be forced on earlier supplies.

Is a rooftop solar plant immovable property under GST?

Not automatically. The Court said fixing a solar system to a foundation for stability does not by itself make it immovable property. Each case depends on how the plant is attached and whether it can be removed and reused.

Does this ruling affect OPEX or RESCO solar customers?

Only indirectly. Under OPEX or RESCO, the developer owns the plant and carries the GST on construction, while the customer pays a per-unit tariff. Customers should still check the PPA's change-in-law clause.

Who decided the case and when?

A bench of Justice Sanjay Kumar and Justice Sanjeev Sachdeva decided M/s Sterling and Wilson Pvt. Ltd. v. Union of India on 16 November 2026, reported as 2026 INSC 1222.

About SustVest

SustVest (SolarGridX Ventures Pvt Ltd) is a rooftop solar developer in India, ranked in the CRISIL Top-10 (#5 in 2026), with 80+ distributed solar plants of about 30 MW across 13 states. Under our OPEX/RESCO model we fund, build, own and maintain the rooftop plant, and you pay a lower per-unit tariff with zero upfront cost. We also deliver CAPEX projects through our own EPC and procurement team. Talk to our team about a rooftop solar plan for your site.